Project Details
Client: US Fish & Wildlife Service
Location: Kofa National Wildlife Refuge near Yuma, AZ
Year: 2022
Industry: Telecommunications
Service: Solar Rehabilitation
System: Stand-Alone, Solar with Battery and Generator backup

Contact Us

Contact us today for more information, a quote on work, or just to connect.


   1-866-945-7596
   [email protected]
   150 N. William Dillard Dr., Suite 109,
Gilbert, AZ 85233

Solar Rehabilitation

Signal Peak

ISC was responsible for the removal and rehabilitation of an off-grid solar power system at the Kofa National Wildlife Refuge near Yuma, AZ. This small repeater system, accessible only by helicopter, had ended its useful life and needed repair. All personnel, tools and materials were hauled up the mountain peak via helicopter and long line. ISC provided all replacement material, removed the existing equipment, then installed and tested new equipment. Sites like this one require specialized coordination of labor and equipment. Our experience with these specialized logistics is why we are frequently selected for these types of projects. Unexperienced contractors often fail to plan for the many variables helicopter use entails which can end up increasing costs significantly. ISC performed this project on time with no incidents, satisfying the requirements of the U.S. Fish and Wildlife service.

Scroll to Top